Access Pipes, Access Bends & Access Plugs

Every drainage system needs to be rodded eventually. Access fittings put a removable, sealed cover exactly where a blockage is most likely to form, so the run can be cleared without cutting pipework out of a duct or a ceiling void.

Also searched as: access pipe, access bend, rodding access, inspection pipe, access plug, cleanout

Where access is required

At the foot of every discharge stack, at changes of direction, at the head of every run, and at intervals along long horizontal runs. Local authority requirements in the UAE follow the same principle as BS EN 12056 — if a length of pipe cannot be rodded from an existing point, it needs its own access.

Types

Access pipe — a straight section with a bolted or screwed cover plate. Access bend — the same cover built into an 87.5° or 45° bend, used at the base of stacks. Access plug — a screwed plug fitted into the socket of a branch or a cleaning eye.

Installation

Position the cover so it faces into an accessible space and can actually be unscrewed — an access fitting buried against a wall or facing a slab is worse than none, because it gives false confidence at design stage. Check the seal and the fixings are refitted correctly after testing.

Frequently asked

How often do I need an access point on a horizontal soil run?
At every change of direction, at the head of the run, and at intervals such that no part of the run is beyond rodding reach from an access point. Confirm the spacing against the approving authority for the emirate.